HYDERABAD – National Mineral Development Corporation is constructing an integrated iron ore-to-pellet production network, targeting a capacity of 24 million tonnes, according to Chairman and Managing Director Amitava Mukherjee.
The state-run miner started operations on a 135-kilometer slurry pipeline alongside a 2 million tonne pellet plant at Nagarnar in September. Company executives intend to upgrade the Nagarnar facility to 6 million tonnes per annum in the near term, eventually reaching 13 million tonnes.
Building Logistics and Slurry Infrastructure
Pellet output should hit 24 million tonnes annually once the firm achieves its broader iron ore production goal of 100 million tonnes. This output scale is designed to secure the enterprise’s status as the nation’s leading pellet manufacturer. Leadership regards the new slurry pipeline and processing units as vital long-term capital assets.
Beyond traditional iron ore extraction, the company has ventured into coal mining. Commercial extraction has officially begun at the Tokisud block in Jharkhand, introducing a fresh mineral and geographic segment to an operational profile that already includes diamond and gold assets.
The infrastructure investments and logistical upgrades will serve as the backbone of our next growth phase, ensuring faster market reach and operational efficiency.
Accelerating Tenders and Procurement Speeds
Logistical enhancements also include fresh conveyor connectivity at the Kumaraswamy mine, permitting rail dispatches of roughly 1.5 million tonnes of iron ore fines through Ranjitpura. Management stressed that faster procurement cycles remain central to future scaling efforts, noting that a technology package worth ₹9,500 crore was awarded within 25 days of technical bid openings.
Market watchers will monitor upcoming quarterly production reports to gauge whether logistical bottlenecks clear quickly enough to meet the 100 million tonne iron ore extraction target.